Home > Investment & Development > 52 of 53 Bay-Area Hotels in Japan Sit on Top-Risk Liquefaction Ground

52 of 53 Bay-Area Hotels in Japan Sit on Top-Risk Liquefaction Ground

Posted: 2026.10.31

Investment & Development

We overlaid the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) “Liquefaction Tendency Map Based on Landform Classification,” published on its Real Estate Information Library, onto the 53 operating hotels (23,741 rooms) in six bay-front areas: Maihama, Ariake/Odaiba, Kaihin-Makuhari, Kobe’s two artificial islands, Osaka Nanko and the Chubu Centrair airport island. Fifty-two hotels with 23,676 rooms (99.7% of rooms) stand on meshes classified as “reclaimed land” with a liquefaction tendency of “very prone to liquefaction” (Level 1, the highest of five). The remaining hotel (65 rooms) sits on “polder” (Level 2); none of the six areas has a hotel on ground rated “not prone to liquefaction.” This article is not about the cost of piles or ground improvement for new builds. It addresses the side that acquires and continues to hold these 23,700 existing rooms. We check what happened on Port Island in 1995 and in Urayasu in 2011 against primary sources, test whether the hazard is priced into room rates using the estimated settled ADR of the six municipalities, and lay out the items to verify in acquisition due diligence and the per-room range of BCP capex for power intake, water supply/drainage and exterior works.

About the Data in This Article
• ADR (average daily rate) = estimated settled rate (tax-exclusive equivalent), calculated by applying segment-specific adjustment factors to the lowest-plan rate each property publishes on OTAs (per room, 2 guests per room, tax-inclusive). Cross-checked against property-level results disclosed by listed hotel REITs (91 properties, most recent 3 months), the median error is about 7%. These are estimates and differ from each property’s actual transaction prices and accounting figures.
• Area-level (prefecture / municipality) ADR is the median of the estimated settled rates of the properties covered (the level of a typical property in the area).
• Where listed prices are mentioned, they are the per-room rate for 2 guests (tax-inclusive).
• OCC (occupancy) = rooms sold as a share of total rooms in the area (an estimate based on OTA sales inventory).
• Source: MetroEngines Research (continuous tracking of OTA published prices for about 168,000 properties in Japan, of which about 27,000 are confirmed operating)

Scope: The room stock in this article covers lodging facilities with 10 or more rooms (excluding leisure/love hotels) within a 1,500m radius of each of nine points: Maihama, Daiba, Ariake, Kaihin-Makuhari, Port Island, Rokko Island, Osaka Nanko (Sakishima), Chubu Centrair airport island and Tokoname Rinku. “Operating” means a selling price was confirmed on major booking sites in the latest three months (August to October 2026), as of October 24, 2026 (MetroEngines Research). Facilities in overlapping radii were de-duplicated and counted once, and Odaiba/Ariake, Port Island/Rokko Island, and the airport island/Rinku were each merged into one area, for six areas in total.

About liquefaction tendency: The MLIT City Bureau’s “Liquefaction Tendency Map Based on Landform Classification” does not assume any specific earthquake; it shows the relative tendency to liquefy on a five-level scale based on the representative landform (micro-landform) of each 250m x 250m mesh, and MLIT notes that it does not draw precise boundaries. Our classification is based on the landform class of the mesh containing each hotel’s coordinates, and does not reflect site-specific ground improvement, whether piles reach the bearing stratum, or the building’s design standards. Standing on reclaimed land is not the same as a building being damaged by liquefaction; the map should be used as the “entry point” for checking the geotechnical survey report and PML at acquisition.

Hotels covered
53
23,741 rooms, 6 areas, operating
Reclaimed land, Level 1
52
23,676 rooms (99.7%)
Opened 1994 or earlier
14
8,051 rooms (33.9%)
Urayasu est. settled ADR
¥22,360
Sep 2026, 2.09x prefecture avg (N=30)
Added BCP capex
¥139K–362K
Per room, retrofit estimate for 53 hotels (editorial estimate)
Key Takeaways
  • — 52 hotels with 23,676 rooms (99.7%) of the 53 operating hotels (23,741 rooms) in the six areas stand on meshes classified as “reclaimed land” with liquefaction tendency Level 1 (as of October 24, 2026).
  • — No ground-related discount can be identified. Urayasu’s estimated settled ADR was ¥22,360 in September 2026, 2.09x the Chiba Prefecture average; rates move with demand anchors.
  • — The 14 hotels (8,051 rooms) opened in 1994 or earlier may have been designed under different liquefaction assumptions, so they offer the highest return on time spent reviewing geotechnical survey reports and structural calculations.
  • — Added BCP capex is ¥139K–362K per room across four packages: flexible joints at utility intakes, relocating power-receiving equipment to upper floors, emergency generators and an exterior-works contingency (retrofit of existing buildings, editorial estimate).
  • — 8.1–21.9 days of room revenue. Dividing the ¥154K–417K per room for the 300-room band by Urayasu’s rate (assuming 80% occupancy) puts it on roughly the same scale as the ¥571K of room revenue lost in a one-month closure.

Room Stock in the Six Areas — 52 of 53 Hotels (23,741 Rooms) on Level 1 Reclaimed Land

Table 1 breaks down the six areas. The largest is Maihama with 15 hotels and 7,199 rooms, where large properties of 500+ rooms line up around the Tokyo Disney Resort’s directly operated and official hotels. Ariake/Odaiba (12 hotels, 5,810 rooms) is dominated by city hotels supported by exhibition and convention demand, while Kaihin-Makuhari (8 hotels, 3,811 rooms) still has the first generation of the Makuhari New City that opened in the early 1990s. Kobe’s two islands hold 6 hotels with 1,721 rooms, Osaka Nanko 6 hotels with 1,685 rooms, and the Chubu Centrair airport island and Rinku 6 hotels with 3,515 rooms. The three Tokyo Bay areas alone account for 35 hotels and 16,820 rooms, or 70% of the total.

Table 1 Room stock and liquefaction tendency in the six areas (53 operating hotels, as of October 24, 2026)
AreaOperatingRoomsReclaimed land, “very prone to liquefaction” (Level 1)Opening yearsOpened 1994 or earlier
Maihama (Urayasu City)15 hotels7,19914 hotels, 7,134 rooms (the remaining hotel, 65 rooms, is on polder, Level 2)1986–20264 hotels, 2,967 rooms
Ariake/Odaiba (Koto Ward, Minato Ward)12 hotels5,81012 hotels, 5,810 rooms1996–20240 hotels, 0 rooms
Kaihin-Makuhari (Mihama Ward, Chiba City)8 hotels3,8118 hotels, 3,811 rooms1990–20266 hotels, 3,280 rooms
Port Island/Rokko Island (Chuo Ward and Higashinada Ward, Kobe)6 hotels1,7216 hotels, 1,721 rooms1981–20262 hotels, 1,004 rooms
Nanko/Sakishima (Suminoe Ward, Osaka City)6 hotels1,6856 hotels, 1,685 rooms1994–20252 hotels, 800 rooms
Chubu Centrair airport island/Rinku (Tokoname City)6 hotels3,5156 hotels, 3,515 rooms2005–20190 hotels, 0 rooms
Total53 hotels23,74152 hotels, 23,676 rooms1981–202614 hotels, 8,051 rooms
Source: MetroEngines Research & Consulting (room stock, as of October 24, 2026); MLIT Real Estate Information Library, “Liquefaction Tendency Map Based on Landform Classification” (our tally overlaying hotel coordinates on the landform class of each 250m mesh). Opening years are as registered and include openings before rebranding.

The key axis for reading this is opening year. Of the 53 hotels, 14 (8,051 rooms) opened in 1994 or earlier, i.e. before the 1995 Southern Hyogo Prefecture Earthquake; 16 (7,575 rooms) opened between 1995 and 2010; and 23 (8,115 rooms) opened in 2011 or later, after the 2011 Tohoku earthquake. The 2000 amendment to the Building Standards Act and the MLIT notification of the following year (2001) are understood to have positioned the assessment of liquefaction risk within the ground surveys used to determine allowable bearing capacity, so buildings designed before 1995 and those designed after 2011 may differ in how far liquefaction was assumed at the design stage. This does not mean “older buildings are weaker.” Hilton Tokyo Bay (828 rooms) and Hotel Okura Tokyo Bay (427 rooms), both opened in Maihama in 1988, and the large properties that opened in Kaihin-Makuhari in 1993 came through the 2011 liquefaction in Urayasu and are still operating, examples of pile-supported buildings that suffered no critical damage from liquefaction (Hilton Tokyo Bay’s room count and opening year match the table of 37 hotels in Japan and the history section of Hilton’s “Company Overview,” updated August 25, 2026). Opening year is best used as a pointer for deciding “which parts of the geotechnical survey report and structural calculations to read” at acquisition.

Figure 1 Room count by area and opening period (53 hotels, 23,741 rooms)
Source: MetroEngines Research & Consulting (room stock, as of October 24, 2026). Opening years are as registered and include openings before rebranding.
Three Tokyo Bay areas — Maihama, Ariake/Odaiba, Kaihin-Makuhari (circle size = rooms, color = opening period)
Source: MetroEngines Research & Consulting (hotel coordinates and room counts). Landform classes from the MLIT Real Estate Information Library. Individual hotel names are not shown in pop-ups.
Kobe — Port Island and Rokko Island (same)
Source: Same as above. 1994 or earlier 1995–2010 2011 or later

Port Island 1995 and Urayasu 2011 — Lifelines and Access, Not Buildings, Were What Stopped

How liquefaction of reclaimed land actually plays out is recorded in primary sources for two earthquakes. Table 2 extracts only the events with figures from the Kobe City Development Bureau report held in Kobe University’s Earthquake Disaster Archive, MLIT City Bureau materials, and Urayasu City’s reconstruction grant evaluation.

Table 2 Reclaimed-land events recorded in primary sources for the 1995 and 2011 earthquakes
EarthquakeLocationEvent recorded in primary sourcesSource
Southern Hyogo Prefecture Earthquake (January 17, 1995, M7.3)Port IslandMore than half of the island’s area was affected by liquefaction; cases are recorded of quay walls displaced several meters seaward with the ground behind them settling about 2m. The fill was mainly decomposed granite (“masa” soil) from the Rokko Mountains.Kobe University Earthquake Disaster Archive (Kobe City Development Bureau 1995 report), MLIT City Bureau materials
SameRokko IslandIn addition to masa soil, the fill included Kobe Group sediment long considered resistant to liquefaction based on its grain-size distribution, yet liquefaction-induced ground settlement with protruding foundations on the island and the collapse of a side span of the Rokko Ohashi Bridge (Rokko Island side) are recorded.Kobe University Earthquake Disaster Archive, MLIT Kinki Regional Development Bureau materials
SamePort of Kobe overallSome seawalls tilted more than 5m seaward and container terminals became unusable. Electricity, water and other lifelines stopped, and container throughput, which ranked 6th in the world in 1994 before the quake, roughly halved in 1995. Kobe City’s “Port of Kobe Reconstruction Declaration” came in 1997.MLIT City Bureau, Cabinet Office “Indomitable Land,” Kobe Gakuin University materials
2011 Tohoku Earthquake (March 11, 2011, M9.0)Urayasu CityLiquefaction occurred over about 1,455ha, about 86% of the city area. Building damage totaled 9,185 (24 totally destroyed, 1,560 large-scale half destroyed, 2,185 half destroyed, 5,416 partially damaged); about 3,700 buildings in the Nakamachi and Shinmachi districts were certified as half destroyed or worse due to tilting.Urayasu City reconstruction grant program comprehensive evaluation; Urayasu City liquefaction countermeasure technical study report
SameMaihamaTokyo Disneyland closed from March 12 and, after liquefaction repairs to its parking lots, reopened with shortened hours on April 15. The two directly operated hotels on site reopened the same day.Oriental Land announcement (media reports, April 2011)
SameUrayasu City (countermeasure cost)Rough estimate for grid-type ground improvement under existing detached-house lots: ¥4M–10M per house (study-stage estimate; varies with the public/private cost split)Urayasu City urban liquefaction countermeasure committee materials
Source: Compiled by MetroEngines Research & Consulting from the primary sources listed in each row

What the two cases have in common is that damage concentrated on surrounding ground, seawalls, lifelines and access routes rather than on pile-supported buildings. On Port Island, quay displacement and settlement of the ground behind made the container terminals unusable, and lifelines such as electricity and water stopped. In Urayasu, although liquefaction hit 86% of the city, only 24 buildings were totally destroyed; the core of the damage was “half destroyed or worse” certifications due to tilting (about 3,700 buildings) and damage to water, sewer and roads. In Maihama, Tokyo Disneyland closed for about a month for liquefaction repairs to its parking lots, and the two hotels on site reopened on the same April 15. For hotels, the impact showed up as “the period when they could not operate” more than as building repair costs.

Differences in fill material also matter. Port Island’s fill is mainly masa soil from the Rokko Mountains, while Rokko Island also used Kobe Group sediment long considered resistant to liquefaction based on grain size, yet the island still experienced liquefaction-induced ground settlement. Even within the same “reclaimed land, Level 1” mesh, outcomes vary with fill material, construction era and whether seawalls were seismically reinforced. The 250m-mesh landform classification does not distinguish at this level. That is exactly why, at acquisition, the fill’s grain size and N-values and the liquefaction assessment (PL value) need to be read individually in the geotechnical survey report.

The countermeasure cost estimate in Urayasu’s materials is also instructive for holders of existing stock. A study-stage figure of ¥4M–10M per house was given for grid-type ground improvement under existing detached-house lots, and MLIT likewise explains that improving ground under an existing building costs considerably more than on a vacant site because of working-space limits and buried utilities. Improving the ground directly beneath an operating hotel is not realistic, so investment goes not toward “changing the ground” but toward “not stopping operations even if liquefaction occurs”: lifeline flexibility, the floor on which equipment is installed, and a contingency for restoring exterior works.

Is the Hazard Priced Into Rates? — Estimated Settled ADR in the Six Municipalities Follows Demand Anchors

If reclaimed-land conditions were reflected in room rates, they could be used as grounds in acquisition price negotiations. Table 3 lists the estimated settled ADR of the municipalities containing the six areas for September 2026 (a settled month), the trailing 12-month average, and the ratio to the prefectural average.

Table 3 Estimated settled ADR in the six municipalities — September 2026, trailing 12-month average, ratio to prefectural average
Municipality (area)Sep 2026 est. settled ADRYoYTrailing 12-month avgPrefecture, Sep 2026 (YoY)Ratio to prefecture avg
Urayasu City (Maihama)¥22,360 (N=30)-4.4%¥23,780Chiba ¥10,680 (+8.8%, N=424)2.09x
Koto Ward (Ariake/Odaiba)¥14,290 (N=39)+12.4%¥14,309Tokyo ¥13,660 (+1.9%, N=1139)1.05x
Mihama Ward, Chiba City (Kaihin-Makuhari)¥17,009 (N=13)+43.6%¥13,824Chiba ¥10,680 (+8.8%, N=424)1.59x
Chuo Ward, Kobe (Kobe’s two islands)¥12,120 (N=64)+0.2%¥11,627Hyogo ¥12,749 (+2.5%, N=547)0.95x
Suminoe Ward, Osaka City (Osaka Nanko)¥10,465 (N=7)-31.5%¥12,189Osaka ¥9,310 (-32.4%, N=655)1.12x
Tokoname City (Centrair airport island/Rinku)¥11,518 (N=13)+23.0%¥8,333Aichi ¥12,372 (+45.9%, N=505)0.93x
Source: MetroEngines Research & Consulting (estimated settled ADR, tax-exclusive equivalent, 2 guests per room). The trailing 12-month average is the mean of settled months from October 2025 to September 2026 in which the number of properties covered was at least 60% of the series median. Chuo Ward, Kobe includes inland properties such as Sannomiya.
Figure 2 Estimated settled ADR, September 2026 — municipality vs. prefectural average
Source: MetroEngines Research & Consulting (estimated settled ADR, tax-exclusive equivalent, September 2026)
Figure 3 Urayasu City estimated settled ADR by month (years overlaid)
Source: MetroEngines Research & Consulting (settled months only; N=29–30 properties in 2026)

In short, no ground-related discount can be identified in any of the six municipalities. Urayasu was ¥22,360 in September 2026, 2.09x the Chiba Prefecture average (¥10,680), and its trailing 12-month average of ¥23,780 runs above the Tokyo average. The -4.4% YoY is a reaction against a busy autumn 2025 base; the monthly trend (Figure 3) shows 2026 tracing almost the same seasonal pattern as 2025, peaking at ¥26.6K in March and sitting in the ¥18K range in summer. Koto Ward was ¥14,290 (+12.4% YoY) and Mihama Ward, Chiba City ¥17,009 (+43.6%), driven respectively by convention/exhibition events and depth of demand including a new opening in June 2026 (note that Mihama Ward has only N=13 properties, so month-to-month swings are large).

Meanwhile, Suminoe Ward’s -31.5% is a reaction to September 2025 falling within Expo 2025 Osaka, Kansai, and the Osaka Prefecture average fell by a similar -32.4%. Tokoname’s +23.0% and the Aichi average’s +45.9% reflect a month overlapping with lodging demand for the Aichi-Nagoya Asian Games, held from late September to early October 2026. Chuo Ward, Kobe was flat at ¥12,120 (+0.2% YoY), but its N=64 includes inland properties such as Sannomiya and is not a rate isolated for the six hotels on the two artificial islands. In every municipality, rates are driven by demand anchors (theme parks, exhibition centers, the Expo, international sporting events, airports), the same picture as our earlier analysis of Chuo Ward, Niigata City (100% of 6,415 rooms on liquefaction-prone ground with no ADR gap).

For holders and acquirers, this has two implications. First, there is little room on the market-price side to negotiate on the basis of the hazard. Second, for the same reason, liquefaction preparedness has to be designed as an investment recovered not through room rates but through shorter closures and improvements in PML and insurance premiums. The following sections lay out the items needed for that design.

Seven Items to Check in Acquisition Due Diligence — Piles, Utility Intakes, Equipment Floors, PML, Insurance

An engineering report (ER) is a survey that quickly identifies a building’s physical risks during real estate due diligence, consisting of building condition assessment, regulatory compliance, repair and replacement costs, replacement cost, environmental risk and seismic risk assessment. When acquiring a hotel on reclaimed land, this standard structure needs to be read with liquefaction in mind. Table 4 sets out what to check, and in which documents, for existing stock like the 53 hotels in this article.

Table 4 Seven items to check when acquiring a hotel on reclaimed land
ItemWhat to checkDocuments
1. Ground and foundationsWhether piles reach the bearing stratum, pile type and length, whether a liquefaction assessment was made at design, and the year of building confirmation (before or after the 2000 Building Standards Act amendment and the 2001 notification that positioned liquefaction risk within ground surveys)Geotechnical survey report, structural calculations, building confirmation and inspection certificates
2. Utility intakesWhether water, drainage, gas and power intakes have flexible joints, the material and replacement year of buried pipes, and the location of water tanks and pump roomsMEP as-built drawings, repair history, utilities’ seismic upgrade status
3. Equipment floor levelThe floor on which power-receiving equipment (cubicle), emergency generators and fuel tanks, water pumps, boilers and servers are installed. If concentrated in the basement or ground floor, there is room to move them up.Equipment layout drawings, engineering report (repair and replacement costs)
4. Exterior works, parking and accessRepair records of settlement and offsets from 2011 and 1995, buried structures, who manages surrounding roads, and alternatives to public transit (automated guideway transit, connecting bridges)Repair history, municipal recovery records, BCP documents
5. Seismic PMLOrder a PML that includes liquefaction as a condition. Expressed as the 90% non-exceedance loss ratio relative to replacement cost; in transaction practice, 15–20% or lower is a common benchmark.PML report, engineering report (seismic risk assessment)
6. InsuranceWhether commercial property insurance covers earthquake risk, limits and deductibles, and the scope of business interruption cover. How the criteria for liquefaction damage (added to residential earthquake insurance in June 2011) are treated in commercial policy wording.Policy and endorsements (held by the seller)
7. BCP operationsHow many days the hotel can keep operating during water and power outages, days of stock in water tanks, wells and generator fuel, and procedures for accepting stranded commuters and guestsBCP documents, drill records, agreements with municipalities
Source: Compiled by MetroEngines Research & Consulting. PML definition per Tokio Marine dR; engineering report structure per National Research Institute for Earth Science and Disaster Resilience materials (based on BELCA guidelines).

The first thing to look at is the combination of items 1 and 3. If the piles reach the bearing stratum, the building itself is unlikely to settle or tilt from ground liquefaction, and the investment focus shifts to the lifelines and equipment in items 2–4. Conversely, if power-receiving equipment, generators and water pumps are concentrated in the basement or on the ground floor, operations stop as soon as settlement of the surrounding ground damages the intake pipes. Remember that in Urayasu, the main causes of closure were water, sewer and parking lots, not damage to buildings.

Item 5, seismic PML, expresses the physical loss at the 90% non-exceedance probability, for ground motion with a 10% probability of exceedance in the next 50 years, as a percentage of replacement cost; in transaction practice, 15–20% or lower is referenced as a benchmark. J-REITs customarily disclose property-level seismic PML in their securities reports, and 7 of the 53 hotels in the six areas fall within this disclosure framework as investment-corporation holdings (Table 7). Whether liquefaction is included in PML calculation conditions depends on the order specifications, so at acquisition we recommend explicitly ordering it “with liquefaction conditions” and reading it together with the insurance terms.

On item 6, insurance, standard commercial fire insurance does not cover earthquake-caused losses, so the decisions are whether to add an earthquake endorsement and how to set limits and deductibles. Residential earthquake insurance added criteria for liquefaction damage in June 2011, but how commercial building policies treat liquefaction losses needs to be checked insurer by insurer. As Ministry of Finance materials show, earthquake insurance rates have historically been designed not to vary greatly by region, ground or structure, so ground conditions are reflected only to a limited degree in premiums. That makes BCP equipment and shorter closures easier to justify as investments than insurance.

Table 7 J-REIT-held properties in the six areas (N=7, ownership as of October 19, 2026)
AreaPropertyRoomsInvestment corporationAcquiredAcquisition price
MaihamaSheraton Grande Tokyo Bay Hotel (via preferred equity)1,016Invincible Investment Corporation2017-10¥14,660M
MaihamaHilton Tokyo Bay828Japan Hotel REIT Investment Corporation—¥26,050M
MaihamaHotel MyStays Maihama90Invincible Investment Corporation2014-07¥4,870M
Ariake/OdaibaHilton Tokyo Odaiba453Japan Hotel REIT Investment Corporation—¥62,400M
Kaihin-MakuhariHotel Francs222Japan Hotel REIT Investment Corporation—¥3,105M
Osaka NankoGrand Prince Hotel Osaka Bay480Hoshino Resorts REIT2016-11¥16,000M
Centrair airport island/RinkuComfort Hotel Central International Airport350Ichigo Hotel REIT Investment Corporation2016-08¥5,308M
Source: Compiled by MetroEngines Research & Consulting from each investment corporation’s portfolio list (IR). N=7 properties (those among the 53 hotels in the six areas confirmed as J-REIT holdings; ownership master as of 2026-10-19). Japan Hotel REIT does not publish property-level acquisition dates in its portfolio list, so the acquisition month is shown as “—”. Room counts for Hilton Tokyo Bay and Hilton Tokyo Odaiba match Hilton’s “Company Overview” (updated August 25, 2026) (828 and 453 rooms).

BCP Capex per Room — ¥139K–362K for Retrofitting Existing Buildings

So how much does equipment investment to prepare existing buildings for liquefaction cost? Rather than ground improvement, we estimated four packages aimed at “not stopping operations even if liquefaction occurs,” by property size band, based on published market prices and public-works unit costs (Table 5). The electrical assumptions are the same published market prices used in our article on tsunami inundation along Onna Village to Nago Bay, with liquefaction-specific flexible joints at utility intakes and a contingency for restoring settled exterior works added.

Table 5 Cost of BCP packages for liquefaction by size band (retrofit of existing buildings, editorial estimate)
Package100 rooms (¥M)300 rooms (¥M)700 rooms (¥M)Assumptions
A. Flexible joints at utility intakes, buried pipe replacement3.0–15.05.0–20.08.0–30.0Each water, drainage and gas intake, plus exposing/replacing buried pipes passing through liquefiable layers (editorial assumption)
B. Moving power-receiving equipment to upper floors15.0–50.015.0–50.020.0–60.0Published market price for cubicle-type high-voltage receiving equipment (¥10M–20M including installation for 300kVA or more), times a 1.5–2.5x factor for removal of existing equipment, structural reinforcement and outage work (editorial assumption)
C. Emergency generator (unit + installation)11.3–25.011.3–25.020.0–40.0Published market prices: diesel 100–200kVA unit ¥8M–15M and outdoor installation ¥3.3M–10M. Two units assumed for 700 rooms.
D. Contingency for restoring settled exterior works and parking5.0–10.015.0–30.030.0–60.0Public estimating unit cost for pavement replacement of ¥2,995/m² (MLIT Hokuriku Regional Development Bureau), plus base course and backfill for ¥5,000–10,000/m² (editorial assumption) x parking/exterior area of 1,000 / 3,000 / 6,000m²
Total (per property)34.3–100.046.3–125.078.0–190.0
Per room¥343K–1,000K¥154K–417K¥111K–271KAssumes retrofit of an existing building, not the incremental cost of building it into a new design
Source: MetroEngines Research & Consulting (retrofit of existing buildings, editorial estimate). Electrical assumptions use the same published market prices as our article on tsunami inundation along Onna Village to Nago Bay.
Figure 4 BCP equipment cost per room by size band (low–high, retrofit of existing buildings)
Source: MetroEngines Research & Consulting (editorial estimate)

Per-room cost comes to ¥343K–1,000K in the 100-room band, ¥154K–417K in the 300-room band and ¥111K–271K in the 700-room band. Because power-receiving equipment and generator costs do not scale with room count, larger properties carry a lighter per-room burden. Mapping the 53 hotels in this article onto the size bands gives 13 hotels (1,418 rooms) under 200 rooms, 23 hotels (7,782 rooms) with 200–499 rooms and 17 hotels (14,541 rooms) with 500 or more; assuming every hotel took the same measures, the total would be ¥3.30bn–8.60bn, or ¥139K–362K per room. The concentration of 500+ room properties in Maihama pulls the per-room burden down.

Dividing this added cost by the estimated settled ADR of each municipality lets us compare the weight of the investment as “how many days of room revenue” (Table 6). The ¥154K–417K per room for the 300-room band equals 8.1–21.9 days at Urayasu’s trailing 12-month average ADR of ¥23,780 and 80% occupancy (a full-year assumption used for conversion), or 23.1–62.6 days at Tokoname’s ¥8,333. Given that the 2011 closure in Maihama lasted about a month, the room revenue forgone in a one-month closure at Urayasu’s level is about ¥571K per room, roughly the same scale as the upper end of the added cost. The argument that equipment investment is recovered through shorter closures can be used as-is in credit and investment committee reviews.

Table 6 BCP equipment cost per room converted to days of room revenue (assuming 80% occupancy)
Municipality (trailing 12-month avg ADR)Est. settled ADR¥154K per room¥417K per room¥189K per room (reference: mid case in the Onna Village article)
Urayasu City¥23,7808.1 days21.9 days9.9 days
Koto Ward¥14,30913.5 days36.4 days16.5 days
Mihama Ward, Chiba City¥13,82413.9 days37.7 days17.1 days
Chuo Ward, Kobe¥11,62716.6 days44.8 days20.3 days
Suminoe Ward, Osaka City¥12,18915.8 days42.8 days19.4 days
Tokoname City¥8,33323.1 days62.6 days28.4 days
Source: Compiled by MetroEngines Research & Consulting. Days of room revenue = equipment cost per room / (estimated settled ADR x 80% occupancy). The 80% occupancy is an assumption for conversion (full-year, common to all municipalities). Sensitivity to occupancy of 60–90% is shown in Table 6-2.

Table 6 assumes 80% occupancy, but even large bay-front properties see annual occupancy swing with seasons and events. Table 6-2 holds Urayasu’s trailing 12-month average ADR of ¥23,780 fixed and varies days of room revenue along two axes: occupancy (full-year average assumption) and equipment cost per room. Even at 60% occupancy, the 53-hotel upper bound of ¥362K is only 25.4 days, below the room revenue lost in a 30-day closure (¥428K). Lower occupancy lengthens the payback in days, but it also shrinks the opportunity loss of a one-month closure, so the rule of thumb “equipment cost ≈ one month of room revenue” broadly holds across 60–90% occupancy.

Table 6-2 Sensitivity of days of room revenue — occupancy x equipment cost per room (Urayasu trailing 12-month avg ADR ¥23,780)
Occupancy (full-year avg assumption)¥139K
(53-hotel low)
¥154K
(300-room band low)
¥189K
(Onna Village article mid)
¥362K
(53-hotel high)
¥417K
(300-room band high)
Reference: room revenue lost in a 30-day closure (per room)
60%9.7 days10.8 days13.2 days25.4 days29.2 days¥428K
70%8.4 days9.3 days11.4 days21.7 days25.1 days¥499K
80%7.3 days8.1 days9.9 days19.0 days21.9 days¥571K
90%6.5 days7.2 days8.8 days16.9 days19.5 days¥642K
Source: Compiled by MetroEngines Research & Consulting (editorial estimate). Days of room revenue = equipment cost per room / (estimated settled ADR x occupancy). ADR is Urayasu’s trailing 12-month average estimated settled ADR (October 2025–September 2026, tax-exclusive equivalent); occupancy is an assumption for conversion.

Note that the amounts in Table 5 assume retrofitting an operating existing building, not the incremental cost of building measures into a new design, and structural reinforcement and temporary works for construction during operation may be extra. As in the tsunami inundation article, generators are not liquefaction-only equipment: they also support business continuity during annual typhoons and outages, and can be depreciated on that basis.

2026 Openings and Planned Supply — 301 Rooms in Makuhari, 381 in Kobe, a 1,000-Room Plan in Mihama Ward

New hotels and rebrands continue on the bay front and artificial islands. On June 18, 2026, KOKO HOTEL Premier Tokyo Bay Makuhari (301 rooms, Polaris Holdings) opened in front of Kaihin-Makuhari Station, and on October 1, Courtyard by Marriott Kobe (381 rooms) opened on Port Island as a rebrand of a fully renovated existing hotel. Both are included in the 53 operating hotels in this article. Among planned projects, building-permit-application data show a 1,000-room mixed-use hotel/cinema/hot-bath complex in Hibino 1-chome, Mihama Ward, Chiba City (scheduled for completion in December 2027), and a 126-room plan in Chidori, Urayasu City. The 750-room project in the same Chidori district (Mitsubishi Estate) already opened on February 13, 2026 as “The Royal Park Hotel Maihama Resort Tokyo Bay,” about 1.6km from our Maihama tally point and just outside this article’s 1,500m radius.

Table 8 2026 openings and planned supply (bay front and artificial islands)
LocationProjectRoomsDetailsStatus
Mihama Ward, Chiba City (Kaihin-Makuhari)KOKO HOTEL Premier Tokyo Bay Makuhari301Opened June 18, 2026 (Polaris Holdings; first property in Chiba Prefecture, with large public bath and sauna)Open (included in this article’s 8 operating hotels)
Chuo Ward, Kobe (Port Island)Courtyard by Marriott Kobe381Existing hotel fully renovated and reopened under the new brand on October 1, 2026 (partnership between HMI Hotel Group and Marriott International)Open (included in this article’s 6 operating hotels)
Hibino 1-chome, Mihama Ward, Chiba CityMixed-use complex of hotel, cinema, restaurants and hot baths (Royal Lease)1,000Construction started January 2025, completion scheduled December 2027, 23 floorsPlanned (building permit application basis)
13-1 Chidori, Urayasu CityHotel (Mitsubishi Estate)750Construction started June 2023, 14 floors. Opened February 13, 2026 as “The Royal Park Hotel Maihama Resort Tokyo Bay” (about 1.6km from the Maihama tally point, outside this article’s 1,500m radius)Open (captured in building permit statistics)
15-9 Chidori, Urayasu CityHotel (Daiichi Realtor)126Construction started October 2024, completion scheduled March 2026, 13 floorsPlanned (building permit application basis)
Source: The two opened projects from each company’s press releases and MetroEngines Research (room stock); the three permit-based projects compiled by MetroEngines Research & Consulting from MLIT’s “Statistical Survey on Building Construction Starts.” *Plans are based on building permit applications at the time of the survey. Counts and rooms are expected to rise as further applications are filed, so treat these as the lower bound of the confirmed pipeline at this point.

New builds can incorporate longer piles or ground improvement at the design stage. That is the difference from acquiring existing stock, and why this article limits itself to the “acquire and hold” side. For analysis from the new-build cost side, see our separate article on construction cost differences from pile length and bearing-stratum depth on Tokyo Bay hotel sites.

Investment Takeaways — Three Steps to Keep Holding Hotels on Reclaimed Land

Before acquisition — Read the geotechnical report and PML with liquefaction conditions

The 250m-mesh landform classification is only an entry point. Confirm in the geotechnical survey report and structural calculations whether piles reach the bearing stratum, the fill’s grain size and N-values, the liquefaction assessment at design and the year of building confirmation, and order seismic PML with liquefaction as a condition. The 14 hotels (8,051 rooms) opened before 1995 offer the highest return on time spent on this review.

During ownership — Direct investment to lifelines and equipment floor levels

Improving the ground beneath an operating hotel is not realistic. Flexible joints at utility intakes, moving power-receiving equipment upstairs, emergency generators and an exterior-works contingency come to ¥139K–362K per room (estimate across 53 hotels). At Urayasu’s rates that is 8.1–21.9 days of room revenue, roughly matching the room revenue lost in a one-month closure.

Price negotiation — The hazard is not in room rates

Estimated settled ADR in the six municipalities moves with demand anchors, and no ground-related discount can be identified. What belongs in the acquisition price is not the market rate but an NOI adjustment based on capex, PML and insurance terms, and the figures in Tables 4–6 provide the grounds.

Frequently Asked Questions

Q. Will a hotel on a “very prone to liquefaction” mesh be damaged in an earthquake?

A. Not necessarily. MLIT’s tendency map shows a relative tendency based on the landform class of 250m meshes and does not reflect site-specific ground improvement or piles. In the 1995 and 2011 cases, damage concentrated on lifelines, exterior works and access rather than on pile-supported buildings. Check individually with the geotechnical survey report and PML at acquisition.

Q. How much do liquefaction measures cost for an existing hotel?

A. Our estimate for four packages (flexible joints at utility intakes, moving power-receiving equipment upstairs, emergency generators and an exterior-works restoration contingency) is ¥154K–417K per room for a 300-room property and ¥111K–271K for a 700-room property (retrofit of existing buildings, editorial estimate). Improving the ground itself is not realistic for an operating building, so costs center on equipment and lifelines.

Q. Is being on reclaimed land reflected in room rates?

A. It cannot be confirmed in the estimated settled ADR of the six municipalities. Urayasu was ¥22,360 in September 2026, 2.09x the Chiba Prefecture average, and Koto Ward and Mihama Ward (Chiba City) rose year on year; rates move with demand anchors such as theme parks, exhibition centers and international sporting events.

Q. What should be added to the engineering report order at acquisition?

A. Three things: include liquefaction in the seismic PML calculation conditions; confirm on drawings the floor level of equipment and whether utility intakes have flexible joints; and obtain from the seller the settlement and repair records from 2011 and 1995. For insurance, check in the policy wording whether commercial property insurance covers earthquake risk and how liquefaction damage is assessed.

Related Articles

References and Sources

■ Data Sources

MetroEngines Research & Consulting room stock (9 points, 1,500m radius, 10+ rooms, excluding leisure/love hotels; 53 operating hotels with 23,741 rooms whose selling prices were confirmed in the latest three months, as of October 24, 2026), estimated settled ADR (municipal and prefectural medians, settled months October 2024–September 2026), and REIT ownership (as of October 19, 2026). Liquefaction tendency was determined by overlaying hotel coordinates on the MLIT Real Estate Information Library “Liquefaction Tendency Map Based on Landform Classification” (250m mesh).

■ Estimate Assumptions

BCP equipment costs assume retrofitting an operating existing building, based on published market prices for cubicle-type power-receiving equipment and emergency generators and public estimating unit costs for pavement replacement, with editorial assumptions for the removal/structural reinforcement/outage-work factor for power-receiving equipment (1.5–2.5x), utility intake replacement costs and exterior/parking area (1,000 / 3,000 / 6,000m²). Days of room revenue = equipment cost per room / (estimated settled ADR x occupancy); 80% occupancy is an assumption for conversion (Table 6-2 shows sensitivity for 60–90%).

■ Limitations

The liquefaction tendency map shows relative tendency without assuming a specific earthquake and does not reflect site-specific ground improvement, whether piles reach the bearing stratum or building design standards. Estimated settled ADR is estimated from OTA published prices and differs from each property’s actual transaction prices and accounting figures. Chuo Ward, Kobe includes inland properties, and Mihama Ward, Chiba City (N=13), Suminoe Ward, Osaka City (N=7) and Tokoname City (N=13) have few properties and large month-to-month swings. Equipment costs exclude structural reinforcement and temporary works for construction during operation.

■ Market Data

  • MetroEngines Research & Consulting — Room stock (9 points, 1,500m radius, as of October 24, 2026, 53 operating hotels with 23,741 rooms), estimated settled ADR (municipal and prefectural, October 2024–September 2026), REIT ownership (as of October 19, 2026)

■ Government Statistics and Public Data

■ REIT and Industry Reports

■ News and Press Releases

Source: Hilton, “Company Overview” (updated August 25, 2026)

Related Articles

  • JNTO Announces March 2026 Foreign Visitor Arrivals to Japan Reached 3,618,900, Up 3.5% Year-on-Year and a Record High for March

  • Golden Week 2026 Hokkaido Hotel Price Analysis: Niseko +29% and the Drivers Behind the Surge in Sell-Out Rates

  • Post-Golden Week Hotel Prices Drop Up to 44%: Why Mid-May Is the Best Time to Book

  • Golden Week 2026 Hotel Price YoY Analysis Across Six Major Cities: Unpacking the Drivers Behind Kyoto (+20%) and Tokyo (+17%)