Holiday Inn Express Sapporo Susukino (223 rooms), announced by IHG Hotels & Resorts on April 27, 2026 and opened on July 17, is a conversion of an existing building through a major renovation. It is owned by a consortium that includes Mitsubishi Corporation Urban Development, Tokyo Tatemono and Sankei Building, and operated by IHG under a management contract. It is the second Holiday Inn Express in Japan and the first in Hokkaido. Within the same 1km radius of Susukino, seven properties with 10 or more rooms (1,115 rooms in total) opened in 2026, bringing operating room stock in the area to roughly 20,000 rooms. This article examines the choice of the “box” (a renovated conversion) and the positioning (mid-priced with breakfast included) through the area’s room-stock trend, the estimated settled ADR in Chuo Ward, booking pace, and building plans for 2027-28.
• ADR (Average Daily Rate) = estimated settled rate (tax-exclusive equivalent), calculated by applying segment-specific adjustment factors to the lowest-plan rate each property publishes on OTAs (per room, 2 guests, tax-inclusive). Benchmarked against property-level results disclosed by listed hotel REITs (91 properties, most recent 3 months), the median error is about 7%. These are estimates and differ from each property’s actual settled rates and accounting figures.
• Area-level (prefecture / municipality) ADR is the median of the estimated settled rates of the properties covered (the level of a typical property in the area).
• Where listed prices are mentioned, they are per-room rates for 2 guests (tax-inclusive).
• OCC (Occupancy) = share of rooms sold relative to total rooms in the area (estimated from OTA sales inventory).
• Source: MetroEngines Research (continuously tracks OTA published prices for approximately 168,000 properties, of which about 27,000 are confirmed operating)
Room stock in this article covers lodging properties with 10 or more rooms (excluding leisure/love hotels) within a 1,000m radius of Susukino. “Operating” refers to properties with a sale price observed on major booking sites in the most recent 3 months (August-October 2026) (as of October 25, 2026; compiled by MetroEngines Research).
- — 7 hotels, 1,115 rooms: properties with 10+ rooms that opened within 1km of Susukino in 2026. That is 5.6% of the 19,980 operating rooms; the net increase, based on properties with a confirmed opening year, is 579 rooms.
- — +44.9%: room stock within 1km grew from 14,532 rooms in 2017 to 21,060 rooms in 2026. Properties opened in the 2020s account for about one-third of operating rooms.
- — ¥16,100 (+7.2% YoY): estimated settled ADR in Sapporo’s Chuo Ward for September 2026 (N=140 properties). Estimated OCC that month was 92.7% (103 properties); the opening rush has not broken rates.
- — 8.8pt gap at LT14: estimated OCC for November 2026 stood at 77.1% at LT14, below the 85.9% September reached at the same point. Where the autumn trough lands depends on last-minute demand.
- — GOP yield 3.0-9.3%: this article’s assumptions for a 223-room conversion under three scenarios. Most of the ¥6.9bn-¥13.2bn spread in total investment comes from the per-room acquisition cost; the price of the box moves the yield more than operating metrics do.
Executive Summary — A 223-Room Conversion Into a 21,000-Room 1km Market; Net Growth of 579 Rooms This Year
The conclusion first. Room stock within 1km of Susukino expanded +44.9% over 10 years, but net growth in 2026 was only 579 rooms, as exits offset the opening of seven properties with 1,115 rooms. Even in September, with more supply, Chuo Ward’s estimated settled ADR held at ¥16,100 (+7.2% YoY) and estimated OCC remained high at 92.7%. In other words, the 2026 opening rush has not broken rates so far. In this market, Holiday Inn Express has entered at almost the same level as the median estimated settled ADR of the 82 business hotels (¥16,400) — with breakfast included — which reads as a strategy of “taking the dead center of the mid-price band with breakfast included.” On the box side, at a time when new-build construction cost reaches an assumed ¥20.67M-¥32.74M per room, choosing a renovated conversion pays off in both time to opening and cost.
Facts of the Opening — What Primary Sources Confirm
First, the facts confirmed by primary sources. According to IHG Hotels & Resorts’ press release (April 27, 2026) and the PR TIMES opening announcement, Holiday Inn Express Sapporo Susukino has 223 rooms, is owned by a consortium including Mitsubishi Corporation Urban Development, Tokyo Tatemono and Sankei Building, and is operated by IHG under a management contract. A major renovation was already under way at the time of the announcement; the materials do not give the name of the building before renovation, and this article does not speculate. It is the first property in Japan to adopt the brand’s next-generation “Generation 5” design, offers an Express Café, fitness room and laundry, and — as a brand-wide feature — includes breakfast with every stay. It is about a 5-minute walk from Susukino Station on the Namboku subway line and about 3 minutes from the Shiseikan Shogakko-mae streetcar stop.
| Item | Details (Source: IHG press release 2026-04-27 / PR TIMES) |
|---|---|
| Rooms | 223 rooms |
| Ownership | Consortium including Mitsubishi Corporation Urban Development, Tokyo Tatemono and Sankei Building |
| Operator | IHG Hotels & Resorts (management contract) |
| Type of opening | Conversion of an existing building via major renovation (pre-renovation building name not stated) |
| Brand positioning | Second Holiday Inn Express in Japan, first in Hokkaido; first Generation 5 design in Japan |
| Facilities | Express Café, fitness, laundry. Breakfast included with every stay (brand standard) |
| Opening date | July 17, 2026 (PR TIMES opening announcement) |
| Location | Minami 5-jo Nishi 6-chome, Chuo-ku, Sapporo (about 5 min walk from Susukino Station) |
| IHG in Japan | 59 hotels across 10 brands, 24 in the pipeline (at the time of announcement) |
In the same release, IHG’s Managing Director for Japan & Micronesia stated that “every hotel IHG opens in Japan in 2026 is a rebrand.” The policy of building supply by converting existing buildings rather than building new applies directly to the Sapporo project. For the reflag of 14 hotels with 1,063 rooms in Kyoto under the same policy, IHG Reflags 14 Kyoto Hotels (1,063 Rooms): 5.9% of Station-Area Stock models the economics down to franchise income and costs. With this in mind, the following sections examine the area’s supply structure in numbers.
10 Years of Room Stock Within 1km of Susukino — From 14,500 to 21,000 Rooms; 2020s Openings Are One-Third of Operating Rooms
Tracking annual room stock within a 1km radius centered on Susukino (43.0547°N, 141.3487°E), based on properties with a confirmed opening year, stock expanded +44.9% from 86 properties / 14,532 rooms in 2017 to 125 properties / 21,060 rooms in 2026. By year, growth was strongest through 2019, at +1,278 rooms in 2018 and +1,888 in 2019; 2020 added +613 rooms and 2021 was roughly flat (-43 rooms); stock then built up again at +673 to +714 rooms a year in 2022-24. 2025 saw only a small +143 rooms before growth resumed in 2026. The 2026 net increase of 579 rooms is the opening of seven properties with 1,115 rooms minus exits.
Splitting operating rooms by decade of opening, properties opened in the 2020s account for 44 properties / 6,516 rooms, or 32.6% of operating rooms; together with 28 properties / 4,526 rooms opened in the 2010s, the majority are buildings from 2010 onward. Meanwhile, 2,970 operating rooms opened in the 1970s-80s remain, so buildings over 40 years old still provide about 15% of the area’s supply. This age profile also shows that a meaningful number of “boxes” exist as candidates for renovated conversion (for room growth across Chuo Ward and the conversion of Tobu Hotel to Fairfield, see Sapporo Chuo Ward Added 9,654 Rooms in 7 Years: Tobu to Fairfield).
By size class, the 34 properties with 201+ rooms hold 10,336 operating rooms, just over half the total. Holiday Inn Express’s 223 rooms sit at the lower end of this class, squarely within the area’s main size band. By category, business hotels account for 82 operating properties / 13,292 rooms, city hotels 16 / 4,579 and deluxe hotels 2 / 352 — business hotels supply two-thirds of the rooms.
7 Openings With 1,115 Rooms in 2026 and 5 With 624 in 2025 — Flagship and Lifestyle Hotels Side by Side Within the Same 1km
Seven properties with 10 or more rooms (1,115 rooms) opened within 1km in 2026: Holiday Inn Express Sapporo Susukino (223 rooms), Hyatt Centric Sapporo (216), KOKO HOTEL Sapporo Susukino 2nd (212), Regionia by Quintessa Sapporo Ekimae (175), Lando Hotel Sapporo Heritage (125) and Prestige (118), and Rakuten STAY Sapporo Nakajima Park (46). The three properties with more than 200 rooms account for 60% of the total. In 2025, five properties with 624 rooms opened, including Holiday Inn & Suites Sapporo Odori Park (195 rooms) and Dansetsu Sapporo (136 rooms). Supply of 12 properties / 1,739 rooms over two years equals about 8.7% of operating rooms.
Hyatt Centric Sapporo was listed as “2026, 216 rooms” among 10 upcoming openings in Hyatt Japan’s press materials (April 2026), and it opened on October 3, 2026. At the time of those materials, Hyatt Japan operated 22 hotels across 9 brands in Japan (5,066 rooms in total), and Park Hyatt Sapporo (157 rooms) is also planned for Sapporo in 2029. The entry of an international brand’s upper segment within 1km of Susukino widens the upper end of the area’s rate distribution.
| Year opened | Property | Rooms | Category | Distance from center |
|---|---|---|---|---|
| 2026 | Holiday Inn Express Sapporo Susukino | 223 | Business hotel | 94m |
| 2026 | Hyatt Centric Sapporo | 216 | Deluxe hotel | 882m |
| 2026 | KOKO HOTEL Sapporo Susukino 2nd | 212 | Business hotel | 314m |
| 2026 | Regionia by Quintessa Sapporo Ekimae | 175 | Business hotel | 972m |
| 2026 | Lando Hotel Sapporo Heritage | 125 | Hostel | 499m |
| 2026 | Lando Hotel Sapporo Prestige | 118 | Hostel | 357m |
| 2026 | Rakuten STAY Sapporo Nakajima Park | 46 | Hostel | 762m |
| 2025 | Holiday Inn & Suites Sapporo Odori Park | 195 | Business hotel | 330m |
| 2025 | Sapporo Fungate Hotel | 139 | Business hotel | 369m |
| 2025 | Dansetsu Sapporo | 136 | Deluxe hotel | 934m |
| 2025 | FAV LUX Sapporo Susukino | 84 | Business hotel | 265m |
| 2025 | Livemax Hostels Sapporo Susukino | 70 | Business hotel | 346m |
Operating in area: 120 properties / 19,980 rooms (164 properties / 25,541 rooms listed)
Nearest stations: Susukino Station (Namboku subway line), Shiseikan Shogakko-mae streetcar stop
| 50 rooms or fewer | 13 properties, 456 rooms |
| 51-100 rooms | 21 properties, 1,395 rooms |
| 101-200 rooms | 52 properties, 7,793 rooms |
| 201+ rooms | 34 properties, 10,336 rooms |
| Business hotel | 82 properties, 13,292 rooms |
| City hotel | 16 properties, 4,579 rooms |
| Capsule hotel | 2 properties, 437 rooms |
| Hostel | 13 properties, 746 rooms |
| Deluxe hotel | 2 properties, 352 rooms |
| Resort hotel | 1 property, 294 rooms |
| Ryokan | 1 property, 182 rooms |
| Dormitory | 2 properties, 57 rooms |
| Other | 1 property, 41 rooms |
Per-Room Cost of a Renovated Conversion — A Comparison Framework Against New Builds at ¥20.67M-¥32.74M per Room
Why convert rather than build new? The level of construction costs explains most of the answer. In Archi-Book’s compilation based on the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) “Building Starts Survey,” hotel construction costs in 2025 were ¥2.405M per tsubo for steel frame, ¥2.026M per tsubo for reinforced concrete and ¥1.952M per tsubo across all structures, holding at a high level versus the 2024 all-structure average of ¥1.955M per tsubo (Building Starts Survey, lodging use) (the site notes that 2025 figures mix planned construction costs with and without consumption tax, so year-on-year comparisons require caution). Compared with the ¥1.0M-¥1.5M per tsubo for business hotels cited by hotel investment media HOTELISM as a benchmark for limited-service hotels (as of 2023), the level has stepped up in just two years.
Converting to a per-room figure requires gross floor area. Holiday Inn Express’s floor area has not been disclosed, so this article uses an assumed range. A useful reference is building plans in the same Minami 7-jo area of Chuo Ward: the building application for a 126-room project at Minami 7-jo Nishi 4-chome lists 7,730.59㎡ of floor area (about 61㎡ per room), and a 200-room project at Minami 7-jo Nishi 5-chome lists 8,554.54㎡ (about 43㎡ per room). A limited-service conversion is likely to be smaller, so we assume 35-45㎡ of floor area per room. For a new build, that implies construction cost of ¥20.67M-¥32.74M per room (excluding land).
There are no published statistics in Japan on renovation-conversion cost as a share of new-build cost. This article therefore assumes 40-60% of new-build cost, on the premise of reusing the existing structure, exterior and core building systems, giving ¥8.27M-¥19.64M per room. This is not Holiday Inn Express’s actual investment, but a framework for converting an existing 223-room building to a hotel in Susukino. The per-room cost of rebranding existing Sapporo hotels is estimated from measured values for 15 properties in Hotel Brand Conversion Costs 1/7 of New Build: 15 Sapporo Hotels. The difference in construction period also matters. IHG announced the project in April 2026 and it opened in July, with renovation already in progress at announcement. Shortening the 2-3 years a new build needs to reach opening, and generating revenue in a strong-demand year like 2026, matters as much as the cost gap.
| Item | New build (assumed) | Renovated conversion (assumed) | Basis / Source |
|---|---|---|---|
| Construction cost per tsubo | ¥1.952M-¥2.405M | 40-60% of new build (assumed) | Archi-Book, “What Is the Construction Cost of a Hotel per Tsubo? [2026 Edition]” (based on the Building Starts Survey) |
| Floor area per room | 35-45㎡ (assumed) | Depends on the existing building’s layout | Limited-service assumed, with reference to the Minami 7-jo Nishi 4 / Nishi 5 building plans (about 61㎡ and 43㎡ per room) |
| Construction / renovation cost per room | ¥20.67M-¥32.74M | ¥8.27M-¥19.64M | This article’s estimate (excluding land and building acquisition cost) |
| Time to opening | 2-3 years (design, building application, construction) | Around 1 year (in this case about 3 months from announcement to opening, with renovation under way at announcement) | IHG press release 2026-04-27, PR TIMES opening announcement |
| Supply-restraining effect | New builds become selective as construction costs stay high | Replacement within existing stock becomes mainstream | IHG: “All of our 2026 openings in Japan are rebrands” |
To translate this into investment returns, the cost of the box must be considered together with the cost of acquiring the building. Dividing the acquisition prices of the seven properties held by J-REITs within the area by their room counts gives a range of ¥11.98M-¥45.75M per room (acquired 2015-2023), one reference level for “buying an existing hotel building in Susukino.” Estimates combining this acquisition range with the renovation range are presented in the investment summary below.
Positioning in the Mid-Price Band With Breakfast — Overlapping the ¥16,400 Median of 82 Business Hotels
Now for price positioning. For 99 operating business, city, deluxe and resort properties within 1km, we plotted the estimated settled ADR for July-September 2026 (the 3-month median of monthly medians) against room count. The median for the 82 business hotels is ¥16,400 and for the 16 city hotels ¥20,100. Holiday Inn Express Sapporo Susukino’s monthly estimated settled ADR swung widely — ¥15,200 in August, ¥18,100 in September and ¥14,700 in October (¥22,400 over 15 days in July, its opening month) — and the September value of ¥18,100 plotted on the chart sits slightly above the business-hotel median. Because this level includes breakfast, the effective value offered is richer than the same price band on a room-only basis.
Looking at room distribution by price band, 36 business hotels with 6,854 rooms cluster in the ¥15,000-¥21,000 estimated settled ADR band, 51.6% of business-hotel rooms in the area. This is the thickest mid-price band, and 2026 openings KOKO HOTEL Sapporo Susukino 2nd (¥16,400) and Regionia by Quintessa Sapporo Ekimae (¥18,700) also landed in it. By contrast, the ¥25,000+ band is thin, with 6 business hotels / 957 rooms and 3 city hotels / 1,194 rooms, and the deluxe-category Hyatt Centric Sapporo (216 rooms; October listed price, all-plan average ¥88,100) sits alone at the top. A thick mid-price band and a thin upper band are the current shape of the Susukino market.
| Est. settled ADR band | Business: properties | Business: rooms | City: properties | City: rooms |
|---|---|---|---|---|
| Under ¥12,000 | 8 | 1,087 | 0 | 0 |
| ¥12,000-15,000 | 21 | 2,638 | 1 | 109 |
| ¥15,000-18,000 | 18 | 3,246 | 4 | 867 |
| ¥18,000-21,000 | 18 | 3,608 | 4 | 944 |
| ¥21,000-25,000 | 11 | 1,756 | 4 | 1,465 |
| ¥25,000+ | 6 | 957 | 3 | 1,194 |
Crowded — ¥12,000-21,000 × 100-300 rooms
The main battleground for business hotels. Differentiation comes from breakfast, loyalty programs and location; the 2026 openings also entered here.
Thin — ¥21,000-25,000 × 150-250 rooms
The boundary between business and city hotels. There is room to step half a level above the mid-price band with lifestyle-style added value (F&B, lounges).
Top end — over ¥25,000 × around 200 rooms
The deluxe category has two properties: Hyatt Centric Sapporo and Dansetsu Sapporo. Upper-band supply is limited until Park Hyatt Sapporo (157 rooms) in 2029.
Chuo Ward Estimated Settled ADR — ¥16,100 in September (+7.2%); February Is the Annual Peak at ¥20,600
Overlaying Sapporo Chuo Ward’s estimated settled ADR (all categories, median) by month makes the seasonal pattern clear. In 2026, February was the annual peak at ¥20,600 and April the trough at ¥8,600, a 2.4x gap. Summer stayed on a plateau — ¥18,100 in July, ¥16,400 in August and ¥16,100 in September — and September was +7.2% YoY (N=140). August was -10.5% YoY, below the prior year, but that is a reaction to an unusually high ¥18,300 in August 2025; compared with August 2024 it remains high.
By category, in February 2026 business hotels were at ¥20,300 and city hotels at ¥29,400; in the Snow Festival month, rates in both categories rise to 1.4-1.8x the surrounding months. September was ¥15,900 for business and ¥19,000 for city hotels. Looking ahead, estimates from listed rates at the time of the survey put February 2027 at ¥22,800 (+10.3% YoY, N=129) and November at ¥11,300 (-10.6% YoY), so the winter peak and autumn trough are expected to continue next season. Travel agency listings give the dates of the 2027 Sapporo Snow Festival (77th) as February 4-11, 2027, and the City of Sapporo has asked the Japan Ground Self-Defense Force to support construction of the large snow sculptures.
Supply and Demand — Estimated OCC of 92.7% in September; November Starts 8.8pt Lower at 77.1% at LT14
We check supply and demand right after the supply increase using Chuo Ward’s estimated OCC and booking curves. Estimated OCC was 92.9% in August 2026 (103 properties / 14,899 rooms, based on major booking-site listings), 92.7% in September (103 properties / 14,907 rooms) and 90.7% in October through the 24th (112 properties / 15,997 rooms). The gap between business and city hotels was within 1pt in every month, showing no category skew in demand.
Drawing booking curves from LT45 to the day before arrival, September (107 properties / 15,278 rooms) built up linearly: 72.7% at LT45, 85.9% at LT14 and 92.7% the day before. November, still in progress (117 properties / 17,511 rooms), is running 8.2-8.8pt below September at the same lead times, at 64.5% at LT45 and 77.1% at LT14. November is also the autumn trough for estimated settled ADR, and this pace comes with listed rates already 10.6% lower. However, Sapporo’s autumn has a high share of last-minute bookings, and even September’s curve added about 7pt between LT14 and the day before. November’s final result will depend on whether this last-minute demand arrives as usual.
| Category | Aug 2026 | Sep 2026 | Oct 2026 (through 24th) |
|---|---|---|---|
| All categories | 92.9% (103 properties / 14,899 rooms) | 92.7% (103 properties / 14,907 rooms) | 90.7% (112 properties / 15,997 rooms) |
| Business hotel | 92.8% (62 properties / 9,614 rooms) | 93.1% (63 properties / 9,665 rooms) | 91.0% (67 properties / 10,435 rooms) |
| City hotel | 93.4% (14 properties / 4,118 rooms) | 92.9% (14 properties / 4,118 rooms) | 91.5% (14 properties / 4,118 rooms) |
This is consistent with REIT disclosures. In Invincible Investment Corporation’s property-level results for August 2026, Hotel MyStays Premier Sapporo Park (419 rooms) within the 1km area posted 92.0% occupancy and ADR of ¥19,659, and Hotel MyStays Sapporo Susukino (104 rooms) posted 94.8% and ¥15,164. These match this article’s Chuo Ward estimated OCC of 92.9% (August); for estimated settled ADR, the two properties’ July-September medians of ¥17,900 and ¥14,000 are 8-9% below the disclosed values, broadly consistent for an estimate.
Next Supply — Plans for 126 Rooms in February 2027 and 200 Rooms in May 2028, and a 575-Room Exit in August 2027
Whether the 2026 openings are absorbed depends on the supply and exits that come next. Our building-plan data, based on MLIT’s “Building Dynamics Statistics,” shows two plans within 1km: a 10-story, 126-room building at Minami 7-jo Nishi 4-chome (7,730.59㎡; construction started June 2025, completion scheduled for February 2027; developer Tokyu Land Corporation), and an 11-story, 200-room building at Minami 7-jo Nishi 5-chome (8,554.54㎡; construction started May 2026, completion scheduled for May 2028; developers Marubeni Urban Development, Haseko Corporation and Sohgo Housing). Neither brand has been announced, so this article treats them as “plans.” Counts based on building applications are a lower bound at the time of the survey and are expected to rise as more applications are filed.
Exits are also large. On June 30, 2026, Tokyu Corporation and Tokyu Hotels & Resorts announced that Sapporo Tokyu REI Hotel (575 rooms, opened June 1980) will close on August 31, 2027 upon expiry of its fixed-term building lease. The successor tenant and operator is Tokyu Resorts & Stay, which plans to reopen it after renovation as a rebranded hotel under its own operation in 2028. The 575 rooms — about 2.9% of operating rooms in the area — will leave the market for about a year, then return as a renovated conversion. The same move as Holiday Inn Express — “renovating an existing box and putting it back on the market” — will continue at one of the largest scales in the area.
| Timing | Project | Rooms | Nature | Source |
|---|---|---|---|---|
| Jul 2026 | Holiday Inn Express Sapporo Susukino | 223 | Renovated conversion; opened | IHG press release / PR TIMES |
| Oct 2026 | Hyatt Centric Sapporo (Kita 1-jo Nishi 5, mixed-use building) | 216 | New build; opened | Hyatt Japan “Press Materials, April 2026” |
| Feb 2027 (scheduled completion) | Minami 7-jo Nishi 4-chome, 10 stories (developer: Tokyu Land Corporation) | 126 | New build; planned (brand not announced) | MLIT “Building Dynamics Statistics” |
| Aug 31, 2027 | Sapporo Tokyu REI Hotel closes | 575 | Exit (rebranded reopening planned for 2028) | Tokyu / Tokyu Hotels & Resorts 2026-06-30 |
| May 2028 (scheduled completion) | Minami 7-jo Nishi 5-chome, 11 stories (developers: Marubeni Urban Development and others) | 200 | New build; planned (brand not announced) | MLIT “Building Dynamics Statistics” |
| 2029 (planned) | Park Hyatt Sapporo | 157 | New build; planned | Hyatt Japan “Press Materials, April 2026” |
Acquisition Prices of 7 J-REIT-Owned Properties — ¥11.98M-¥45.75M per Room, a Reference Point for the Price of the Box
Our ownership master (as of October 19, 2026) confirms seven J-REIT-owned properties with 1,566 rooms within the area: Invincible Investment Corporation’s Hotel MyStays Premier Sapporo Park (419 rooms; acquisition price ¥16,731M) and Hotel MyStays Sapporo Susukino (104 rooms; ¥3,059M); Japan Hotel REIT Investment Corporation’s La’gent Stay Sapporo Odori (219 rooms; ¥10,020M), ibis Styles Sapporo (278 rooms; ¥6,797M) and Mercure Sapporo (285 rooms; ¥6,000M); and Ichigo Hotel REIT Investment Corporation’s THE KNOT SAPPORO (140 rooms; ¥4,900M) and Nest Hotel Sapporo Odori (121 rooms; ¥1,450M). Japan Hotel REIT does not publish property-level acquisition dates in its portfolio list, so the comparison of acquisition timing covers the five properties of the other two REITs.
| REIT | Property | Rooms | Acquisition price | Per room | Acquired |
|---|---|---|---|---|---|
| Invincible Investment Corporation | Hotel MyStays Premier Sapporo Park | 419 | ¥16,731M | ¥39.93M | Aug 2018 |
| Invincible Investment Corporation | Hotel MyStays Sapporo Susukino | 104 | ¥3,059M | ¥29.41M | Jul 2019 |
| Japan Hotel REIT Investment Corporation | La’gent Stay Sapporo Odori | 219 | ¥10,020M | ¥45.75M | — |
| Japan Hotel REIT Investment Corporation | ibis Styles Sapporo | 278 | ¥6,797M | ¥24.45M | — |
| Japan Hotel REIT Investment Corporation | Mercure Sapporo | 285 | ¥6,000M | ¥21.05M | — |
| Ichigo Hotel REIT Investment Corporation | THE KNOT SAPPORO | 140 | ¥4,900M | ¥35.00M | Aug 2023 |
| Ichigo Hotel REIT Investment Corporation | Nest Hotel Sapporo Odori | 121 | ¥1,450M | ¥11.98M | Nov 2015 |
Per-room acquisition prices range nearly 4x, from ¥11.98M to ¥45.75M, showing that the price of the box varies widely with building age, grade and timing of acquisition. THE KNOT SAPPORO, acquired in August 2023 (¥35.0M per room), sits in the same band as the two MyStays properties acquired in the late 2010s (¥29M-¥40M per room), suggesting ¥30M-¥40M per room as the recent transaction level for mid-sized hotels in Susukino and Odori. On that basis, we model the economics of a 223-room conversion.
Investment Summary — Assumed Yields of 3.0-9.3% for a 223-Room Conversion; Acquisition Cost Is the Biggest Variable
We pull the figures so far into one framework. For converting an existing 223-room building to a hotel in Susukino, we set conservative, base and bullish scenarios starting from the estimated settled ADR of Chuo Ward business hotels (July-September median ¥16,400) and estimated OCC (in the 90% range). The GOP margin is assumed at 40-50% for this article. Acquisition cost uses the REIT transaction levels from the previous section, and renovation cost uses this article’s assumed conversion range. All are this article’s assumptions, not Holiday Inn Express’s actual investment or operating figures.
| Item | Conservative | Base | Bullish |
|---|---|---|---|
| ADR (est. settled, tax-excl. equivalent) | ¥15,000 | ¥16,500 | ¥18,000 |
| Annual OCC (assumed) | 80% | 85% | 88% |
| Annual room revenue | ¥0.98bn | ¥1.14bn | ¥1.29bn |
| GOP margin | 40% | 45% | 50% |
| GOP | ¥0.39bn | ¥0.51bn | ¥0.64bn |
| Building acquisition cost (per room) | ¥40M | ¥30M | ¥22M |
| Renovation cost (per room) | ¥19M | ¥14M | ¥9M |
| Total investment | ¥13.2bn | ¥9.8bn | ¥6.9bn |
| GOP-based yield | 3.0% | 5.2% | 9.3% |
The base scenario (ADR ¥16,500, annual OCC 85%, GOP margin 45%, total investment ¥9.8bn) yields 5.2%. A 10% drop in ADR lowers it to 4.7%, a 5pt drop in OCC to 4.9%, and both together to 4.4%. The sensitivity shows that differences in acquisition cost move the yield more than operating swings do. The ¥6.2bn gap in total investment between the conservative and bullish cases breaks down into about ¥4.0bn from the per-room acquisition cost difference (¥40M vs. ¥22M) and about ¥2.2bn from the renovation cost difference (¥19M vs. ¥9M). The conclusion this framework points to is that the economics of a renovated conversion are determined first by “how much you paid for the box,” before operating skill.
| Scenario | Annual room revenue | GOP | Yield |
|---|---|---|---|
| Base | ¥1.14bn | ¥0.51bn | 5.2% |
| ADR −10% | ¥1.03bn | ¥0.46bn | 4.7% |
| OCC −5pt | ¥1.07bn | ¥0.48bn | 4.9% |
| Both | ¥0.97bn | ¥0.44bn | 4.4% |
| Annual OCC \ ADR | ¥14,500 | ¥15,500 | ¥16,500 | ¥17,500 | ¥18,500 |
|---|---|---|---|---|---|
| 77% | 4.2% | 4.5% | 4.7% | 5.0% | 5.3% |
| 81% | 4.4% | 4.7% | 5.0% | 5.3% | 5.6% |
| 85% | 4.6% | 4.9% | 5.2% | 5.6% | 5.9% |
| 89% | 4.8% | 5.1% | 5.5% | 5.8% | 6.1% |
| 93% | 5.0% | 5.4% | 5.7% | 6.1% | 6.4% |
Holding total investment at the base case’s ¥9.8bn and moving ADR and annual OCC together, the yield stays within a range of 4.2% (ADR ¥14,500, OCC 77%) to 6.4% (ADR ¥18,500, OCC 93%), a spread of only about 2.3pt. The gap to 3.0% when acquisition and renovation costs are set at the conservative case (total investment ¥13.2bn) and 9.3% at the bullish case (¥6.9bn) is wider; here too, the per-unit acquisition price of the box, not operating metrics, sets the yield first.
Risk factors can be grouped into three. First, supply: in addition to the 126-room plan in February 2027 and the 200-room plan in May 2028, 575 rooms return as a rebrand in 2028. Second, seasonality: Chuo Ward is a market where estimated settled ADR in February and April differs by 2.4x, and November’s booking pace is about 9pt behind September’s. Full-year RevPAR depends on how much of the winter peak can be captured. Third, construction costs: the higher new-build costs per tsubo stay, the more the relative advantage of conversion is preserved, but renovation costs are subject to the same materials and labor costs. Each is the flip side of upside potential, and the positioning of mid-priced with breakfast included fits Sapporo’s market structure in that it makes it easier to fill seasonal swings with last-minute demand. This is a simplified estimate; actual investment decisions require a detailed feasibility study.
⚠ Note on ADR for future dates:In this article, estimated settled ADR from October 2026 onward and the November booking curve are estimates based on the sale prices and inventory published on OTAs at the time of the survey (October 24, 2026), and will change as check-in dates approach. Please note that prices currently set high may fall with last-minute discounting.
Frequently Asked Questions
Q. When did Holiday Inn Express Sapporo Susukino open, and how many rooms does it have?
It opened on July 17, 2026 with 223 rooms. It is operated by IHG Hotels & Resorts under a management contract and owned by a consortium including Mitsubishi Corporation Urban Development, Tokyo Tatemono and Sankei Building. It is a conversion of an existing building through a major renovation, and is the second Holiday Inn Express in Japan and the first in Hokkaido.
Q. How many hotels opened within 1km of Susukino in 2026?
Seven properties with 10 or more rooms opened, with 1,115 rooms in total — including Holiday Inn Express Sapporo Susukino (223 rooms), Hyatt Centric Sapporo (216 rooms) and KOKO HOTEL Sapporo Susukino 2nd (212 rooms). That equals 5.6% of the roughly 20,000 operating rooms in the area. The net increase, based on properties with a confirmed opening year, is 579 rooms.
Q. What are hotel rates in Sapporo’s Chuo Ward?
MetroEngines Research’s estimated settled ADR (tax-exclusive equivalent, median) was ¥16,100 in September 2026, +7.2% YoY. February is the annual peak at ¥20,600, 2.4x April’s ¥8,600.
Q. How much cheaper is a renovated conversion than a new build?
There are no published statistics in Japan comparing conversion to new-build cost, so this article assumes a range of 40-60% of new-build cost. Hotel construction costs in 2025 (based on the Building Starts Survey) averaged ¥1.952M per tsubo across all structures and ¥2.405M per tsubo for steel frame; assuming 35-45㎡ of floor area per room, new-build construction cost is about ¥21M-¥33M per room, versus about ¥8.3M-¥19.6M for a conversion.
Q. What supply is planned around Susukino?
Building-plan data show a 126-room plan at Minami 7-jo Nishi 4-chome (scheduled completion February 2027) and a 200-room plan at Minami 7-jo Nishi 5-chome (scheduled completion May 2028); neither brand has been announced. Sapporo Tokyu REI Hotel (575 rooms) will close on August 31, 2027 and is scheduled to reopen under a new brand in 2028. Park Hyatt Sapporo (157 rooms) is also planned for 2029.
Summary
Room stock within 1km of Susukino reached 21,000 rooms, up +44.9% over 10 years, and seven properties with 1,115 rooms opened in 2026. Even so, Chuo Ward’s estimated settled ADR rose +7.2% YoY in September and estimated OCC held in the 90% range; the opening rush has not broken rates so far. Holiday Inn Express Sapporo Susukino chose a renovated conversion of an existing building at a time of elevated construction costs and reached opening about three months after the announcement. Its pricing enters the mid-price band that overlaps the median of 82 business hotels — with breakfast included — positioning it to compete head-on for the deepest layer of demand. The next question is how a market with a winter peak and an autumn trough absorbs 326 planned rooms scheduled for completion in February 2027 and May 2028, plus the exit of 575 rooms closing in August 2027 and their later return under a new brand.
Related Articles
References and Sources
■ Data Sources
Published price and inventory data from major booking sites collected by MetroEngines Research & Consulting (room stock within a 1km radius centered near the Susukino intersection; estimated settled ADR, estimated OCC and booking curves for Sapporo’s Chuo Ward), each J-REIT’s IR materials, primary announcements by IHG, Hyatt Japan and Tokyu, and MLIT building statistics.
■ Assumptions
The economics of the 223-room conversion assume ADR of ¥15,000-18,000, annual OCC of 80-88% and GOP margin of 40-50% (all this article’s assumptions), building acquisition cost of ¥22M-¥40M per room (the level of J-REIT acquisition prices in the area), and renovation cost of ¥9M-¥19M per room (assumed 40-60% of new-build cost). Annual room revenue is calculated as 223 rooms × 365 days × ADR × OCC, and yield is GOP divided by total investment.
■ Limitations
Estimated settled ADR and estimated OCC are estimates based on the prices and sell-through of inventory sold on OTAs and do not match each property’s actual results. Values from October 2026 onward are based on listed rates at the time of the survey (October 24, 2026). The economics scenarios are not the actual investment or operating figures of Holiday Inn Express Sapporo Susukino, and taxes, insurance, FF&E reserves, brand fees and the like are not deducted.
■ Primary Sources (Openings and Plans)
- IHG Hotels & Resorts, “IHG signs second Holiday Inn Express in Japan” (April 27, 2026)
- PR TIMES, “Holiday Inn Express Sapporo Susukino” opening announcement (IHG ANA Hotels Group Japan)
- PR TIMES, “Hyatt Centric Sapporo” opens October 3 (NTT Urban Development Hotel Management)
- Tokyu Corporation / Tokyu Hotels & Resorts, “Sapporo Tokyu REI Hotel Will Close on August 31, 2027” (June 30, 2026)
- City of Sapporo, “Request for Support From the Japan Ground Self-Defense Force for the 2027 Sapporo Snow Festival (77th)” (August 25, 2026)
- Hankyu Travel, Sapporo Snow Festival feature (event dates February 4-11, 2027)
■ Market Data
- MetroEngines Research & Consulting — room stock within a 1km radius (164 listed / 120 operating properties), estimated settled ADR (Chuo Ward N=119-140 properties per month; individual properties N=99), estimated OCC and booking curves (Chuo Ward, 103-117 properties), new openings (based on confirmed OTA listings)
- City of Sapporo, “Results of the FY2025 Survey on Sapporo Tourism Trends” (August 21, 2026) — about 16,047,000 visitors to Sapporo; about 2,488,000 foreign overnight guests (+14.1% YoY)
■ Government Statistics and Public Data
- Prepared by MetroEngines Research & Consulting from MLIT “Building Dynamics Statistics” (building plans: 126 rooms at Minami 7-jo Nishi 4-chome, 200 rooms at Minami 7-jo Nishi 5-chome)
- Archi-Book, “What Is the Construction Cost of a Hotel per Tsubo? [2026 Edition]” (based on MLIT “Building Starts Survey”; 2025: steel frame ¥2.405M/tsubo, RC ¥2.026M/tsubo, all structures ¥1.952M/tsubo)
- HOTELISM, “Construction Costs for Opening a Hotel” (December 27, 2023; business hotels ¥1.0M-¥1.5M/tsubo)
■ REIT and Industry Reports
- Invincible Investment Corporation, “Monthly Operating Results, August 2026” (property-level occupancy and ADR; 101 domestic hotels)
- Portfolio lists of Japan Hotel REIT Investment Corporation, Ichigo Hotel REIT Investment Corporation and Invincible Investment Corporation (acquisition prices and room counts)
Source: Hyatt Japan, “Press Materials, April 2026”
Further Reading
- Hotel Brand Conversion Costs 1/7 of New Build: 15 Sapporo Hotels
- Sapporo Chuo Ward Added 9,654 Rooms in 7 Years: Tobu to Fairfield
- IHG Reflags 14 Kyoto Hotels (1,063 Rooms): 5.9% of Station-Area Stock
- JR Hokkaido’s 3 Station Hotels, 806 Rooms: Owners and Required ADR
- Japan Q4 2026 Openings: 32 Hotels, 4,755 Rooms, Only 2,730 Truly New
- One REIT’s 7 Hotels Cost ¥30.9M a Room: ADR-Led Buys, GOP-Linked Rent
- Hiyori Hotel Flex Hakata Reflag: Old ADR 77% of Ward, 4.5-Year Payback
- Hokkaido Hotel Winter Renovation Closures Cut Lost Revenue to 30.5%
