The Japan Tourism Agency (JTA) opened the secondary call for FY2026 applications under its “Comprehensive Tourism-Area Reception-Environment Development Program for Overtourism Prevention and Mitigation” on June 10, with the plan-application deadline set at 12:00 on Friday, July 17, 2026. The budget is ¥10 billion, roughly 8.3x the prior year. The area-integrated track carries a 2/3 subsidy rate and ¥200M ceiling; the general track carries a 1/2 subsidy rate and ¥50M ceiling — large-scale support with expected spillovers into hotel investment in the selected destinations. This paper cross-cuts ADR levels, YoY movement, and new-supply pipelines across prior award recipients and new candidate areas, and quantifies investment potential across three scenario types: demand-dispersion, facility-renovation-subsidy, and MICE.
Metric Definitions Used in This Article
- ADR (Average Daily Rate): Mean of listed OTA rates. Differs from actual transacted rates (typically +25–30% above the transacted ADR disclosed by REITs). Per-room rate for double-occupancy (tax-inclusive), averaged across all plans (from room-only to meal-inclusive).
- OCC (estimated occupancy): Share of sold rooms against total rooms in the area (an estimate based on OTA-listed inventory). Used only at the prefecture and municipality granularity.
- Data sources: MetroEngines Research & Consulting, MLIT, Japan Tourism Agency, JNTO.
- — The JTA’s overtourism-countermeasure budget of ¥10B, roughly 8.3x YoY, has a secondary-call deadline of 12:00 on July 17, 2026. The 20 pioneer-model regions plus 51 general-track projects and 6 secondary-round awards from the prior round are highly likely to be re-selected in the secondary call.
- — Kyoto’s prefectural ADR has settled into a +13–25% YoY range since October 2025. Within Kyoto City, growth in areas outside the core (Sakyo, Fushimi, Nishikyo) exceeds +15–22%, suggesting the area-integrated development upside is already partly priced in.
- — We frame the investment spillover in three types (A: demand dispersion / B: facility renovation & rebranding / C: MICE attraction). Type B (existing-hotel acquisition + renovation) offers the best risk-return profile with an estimated 6–9% IRR and a 5–7 year payback.
- — On a 2-axis ADR ±5% × OCC ±3pt sensitivity for candidate areas, the base case adds +0.8–1.5pt to yields; the subsidy-rejection case removes 1.5–2.5pt. Subsidy approval can be treated as an “upside option.”
- — Against a new-supply pipeline of 1,087 rooms in Kanagawa and 549 rooms in Kyoto, an ADR +5–10% opportunity is realistic in Type-A peripheral areas (Kamakura → Hayama, Kyoto → Otsu/Uji). Existing-asset acquisition and renovation align better with the subsidy schedule than new construction.
Executive Summary — The ¥10B spillover concentrates on “7 regions along the prior-award axis”
Under the FY2024 supplementary budget (predecessor program), 20 pioneer-model regions and 51 general-track projects were selected, with 6 more regions added via the secondary call. Awardees include Kyoto City; Kamakura City / Fujisawa City; Mt. Fuji (Yoshida, Fujinomiya, Gotemba, and Subashiri routes); Shirakawa Village; Takayama City; Miyajima / Miyajimaguchi; Nara Park / Yamanobe-no-michi; Hakone; and Onomichi (source: JTA list of awarded projects). These are areas where inbound concentration is already extremely high and hotel ADRs have overshoot on a YoY basis, and where the secondary call is likely to continue selecting similar regions.
To put the conclusion up front: the subsidy itself is not a direct construction subsidy to individual hotels. However, as area-integrated development — congestion visualization, secondary-transport, and dispersion-routing — advances, three indirect upsides emerge: (1) a shift in overnight demand from established cores to peripheral areas, (2) renovation/rebranding opportunities premised on smoothed occupancy for existing hotels, and (3) a stronger MICE-attraction platform through municipality-DMO collaboration. Below, we validate each with area-level data.
The subsidy scheme — Area-integrated vs. general track
| Item | Area-integrated track | General track |
|---|---|---|
| Applicant | Local government or DMO | Local government, DMO, or private operator |
| Subsidy rate | Up to 2/3 | Up to 1/2 |
| Ceiling | ¥200M | ¥50M |
| Council formation | Required | Not required (municipal-coordination certificate needed) |
| Project scope | Area-wide reception-environment development (multi-issue response) | Specific, individual countermeasures |
| Typical projects | Congestion visualization, secondary-transport networks, park-and-ride, flow separation | Wi-Fi build-out, smart trash bins, AI cameras, cashless payment |
The area-integrated track is a scheme in which municipalities and DMOs act as the lead, coordinating with local tourism operators on area-wide reception-environment development. Council formation and an area-wide consensus-building process are mandatory. The general track has a broader applicant scope — a private operator may apply on its own — but a municipal-coordination certificate from the linked municipality is required. The general-track ¥50M ceiling suits one-off reception-environment investments such as parking, Wi-Fi, smart trash bins, AI cameras, and cashless payment systems (source: JTA solicitation guidelines; Subsidy Portal).
From a hotel operator’s standpoint, one path is applying to the general track solo for sidewalk works or luggage-storage in front of the property; another is joining an area-integrated plan orchestrated by a regional DMO, positioning the hotel as a receiver for dispersed demand. The latter does not bring a direct subsidy but delivers indirect benefits from administratively-led congestion-routing measures.
ADR levels in prior-award areas — Sharp YoY gains in Kyoto, Kamakura, and Kurashiki
Comparing May 2026 ADRs in the leading awarded areas with the prior-year month, double-digit YoY gains are observed in most awarded areas. The backdrop combines an inbound recovery with domestic-travel demand, plus a structural driver in which congestion-averse travelers gravitate toward “reservation-only inns.”
| Area | May 2026 ADR | YoY | N (properties) | Prior-award status |
|---|---|---|---|---|
| Kyoto Prefecture (total) | ¥47,300 | +24.7% | 1,562 | Pioneer model (Kyoto City) |
| Higashiyama Ward, Kyoto | ¥78,200 | +21.0% | 112 | Kiyomizu-dera / Gion area |
| Kamakura City | ¥49,200 | +40.8% | 27 | Pioneer model (Kamakura / Fujisawa) |
| Hakone Town | ¥53,300 | +12.6% | 147 | Awardee (pioneer model) |
| Kurashiki City | ¥49,100 | +20.5% | 23 | New candidate |
| Shirakawa Village | ¥43,900 | +16.7% | 7 | Pioneer model (Shirakawa Village) |
| Takayama City | ¥39,400 | +9.9% | 70 | Secondary-call awardee |
| Hatsukaichi City (Miyajima) | ¥38,600 | +14.6% | 21 | Pioneer model (Miyajima / Miyajimaguchi) |
| Fujikawaguchiko Town | ¥33,700 | +4.7% | 107 | Pioneer model (Mt. Fuji perimeter) |
| Yamanakako Village | ¥38,800 | +13.8% | 37 | Pioneer model (Mt. Fuji perimeter) |
| Nara Prefecture (total) | ¥40,900 | reference | 257 | Pioneer model (Nara Park) |
Kyoto Prefecture-wide ADR runs ¥47,300 with +24.7% YoY (N=1,562); Higashiyama Ward stands out at ¥78,200 (+21.0%) as the highest-priced sub-market among prior awardees. Kamakura City’s +40.8% is a nationally rare gain, though the sample is thin (N=27) and warrants caution. Kurashiki City (+20.5%, N=23), Shirakawa Village (+16.7%, N=7), and Takayama City (+9.9%, N=70) show steady rate gains extending into the world-heritage and historic-district areas of Gifu and Okayama. Around the Fuji Five Lakes, Fujikawaguchiko settles at just +4.7% while Yamanakako runs +13.8%, showing clear intra-area divergence.
Area visualization — Geographic distribution of subsidy-candidate areas
Both candidate areas and prior awardees sit along the “Golden Route” of inbound travel. On the map, they cluster into four regions: Kanto (Kamakura, Hakone, Fuji Five Lakes), Kansai (Kyoto, Nara), central mountains (Shirakawa-go, Takayama), and Seto Inland (Kurashiki, Miyajima).
Source: MetroEngines Research & Consulting; JTA list of awarded projects
Marker size reflects the May 2026 ADR level; color density reflects the YoY gain. The Kanto Kamakura/Hakone cluster and the Kyoto cluster stand out. These are areas where subsidies are already flowing and congestion-visualization and secondary-transport works are in progress. In the secondary call, adjacent peripheral municipalities (Fujisawa City, Yugawara Town, southern and northern Kyoto Prefecture, and the wider Gifu-Hida region) are candidates to emerge as new awardees.
Demand-trend validation — Kyoto’s ADR has settled into a +13–25% YoY range since October 2025
Overlaying Kyoto Prefecture’s monthly ADR by year, we see that 2026 has run persistently at +17–25% YoY through January to May. This is not a one-off event effect; it points to a structural mismatch between inbound demand and constrained supply.
July 2025’s YoY was essentially flat at -0.7%, but the ramp then steepened toward the fall-colors and year-end peaks: +13.4% in October, +13.8% in November, and +19.1% in December. Into 2026, the trend continued at +19.0% in January, +17.2% in February, +18.4% in March, +17.2% in April, and +24.7% in May — over six months of double-digit YoY gains. This is not a transient peak; it reflects a structural mismatch between constrained supply (a slowdown in core-Kyoto new openings) and concentrated inbound demand.
In such a rate-rising phase, once congestion-visualization and secondary-transport enable “reservation-based dispersion,” there is room for demand to flow into peripheral sub-markets (Fushimi, Minami, Yamashina wards; and southern/northern Kyoto Prefecture including Uji, Kameoka, and Amanohashidate). Indeed, Fushimi Ward is +78.8% YoY (N=10) and Minami Ward +125.7% (N=49), higher rates than the core — early signs of dispersion are already visible.
Kyoto City by ward — “Non-core” wards are the upside source
Higashiyama Ward (Kiyomizu-dera / Gion area) tops Kyoto City at ¥78,200, hosting the densest tourism cluster (Kiyomizu-dera, Yasaka Shrine, Pontocho). By contrast, Fushimi Ward, at ¥42,800, is +78.8% YoY, and Minami Ward, at ¥53,800, is +125.7% — the areas south of Kyoto Station are moving especially fast. As dispersion progresses, supply pressure in the core wards (Higashiyama, Nakagyo, Shimogyo) will ease, and demand will structurally shift toward Fushimi, Minami, and Yamashina — a shift already observable in the data.
Once subsidy-funded congestion-visualization takes root, more travelers may choose “an inexpensive inn in a peripheral area linked by secondary transport, avoiding the high-priced core.” That does not necessarily lower core-ward occupancy, but it does support occupancy and ADR in the periphery.
New-supply pipeline — Planned inventory of 1,087 rooms in Kanto, 549 rooms in Kyoto
Aggregating new supply in candidate areas from the MLIT “Building Dynamics Statistical Survey” on a filed-application basis surfaces the following pipeline: 1,087 rooms in Kanagawa (including Kamakura, Hakone, Yokohama), 549 rooms in Kyoto, 490 rooms in Okayama, 380 rooms in Hiroshima, 200 rooms in Okinawa, 120 rooms in Gifu, and 54 rooms in Yamanashi.
Kanagawa’s 1,087 rooms include a 272-room project in Kita-Nakadori, Naka Ward, Yokohama City (May 2027 completion) and a 126-room project in Kowakudani, Hakone Town (October 2026 completion). Kyoto’s 549 rooms reflect only currently filed applications; note the structural characteristic that this count will rise as more filings arrive. Okayama’s total is anchored by a 300-room urban-redevelopment project in Nodayacho, Kita Ward, Okayama City, and a 190-room project in Okayama Ekimae-cho. Hiroshima’s 380 rooms are believed to include projects in the Fukuyama-Kure area.
Among 2026 new openings (OTA-listed basis): Kyoto’s Omuro Kadensho (67 rooms), KAI Miyajima in Hiroshima (54 rooms), Toyoko Inn Kure Station (218 rooms), APA Hotel & Resort Okayama Ekimae Shinkansen-guchi (600 rooms), and Livemax Resort Isawa Onsen in Yamanashi (136 rooms). Note that these are opening not in tourism cores but in peripheral or secondary tourism nodes — evidence that investors are already selecting sites in anticipation of demand dispersion.
Three investment-spillover scenarios — Demand dispersion / renovation subsidy / MICE
We organize the subsidy’s spillover mechanism into three types from a hotel-investment perspective. In each, the subsidy itself is not a direct construction/acquisition subsidy; area-integrated development makes the investment thesis more attractive.
Type A Demand dispersion (peripheral areas)
Target: Municipalities adjacent to core tourism areas (Fujisawa City, southern Kyoto Prefecture, Gifu-Hida area, Fukuyama / Onomichi, northern Nara Prefecture, etc.)
Scenario: As the subsidy funds congestion-visualization and secondary-transport, overnight-choice sets widen into peripheral areas. Existing hotels smooth occupancy; undeveloped sites gain a new-opening thesis.
Data example: Fushimi +78.8%, Minami +125.7%, Yamashina +63.7% in Kyoto — Type A is already underway.
Type B Facility renovation / rebranding
Target: Existing hotels in awardee cores (mid-sized city/ryokan properties aged 20+ years)
Scenario: As the area’s reception environment improves, ADR is supported over the medium term. Existing hotels can leverage location and reposition toward upper-mid to luxury with renovation capex.
Data example: ADR levels of ¥78,200 (Higashiyama, Kyoto), ¥53,300 (Hakone), and ¥49,100 (Kurashiki) provide adequate underwriting support for the post-renovation rate.
Type C MICE attraction
Target: Municipalities forming area-integrated councils (Kanazawa, Fukuoka, Kobe, Hokkaido Niseko, and other future candidates)
Scenario: As the council function of municipalities and DMOs is reinforced through the subsidy, a one-stop regional interface for MICE organizers takes shape. Development and acquisition potential for mid-to-large MICE hotels rises.
Data example: A ~1,087-room supply pipeline is underway across Kanagawa; locations combining “heritage landscape × banquet capacity” (Kurashiki, Miyajima, Shirakawa-go) offer MICE + leisure duality.
Across the three types: Type A (demand dispersion) is a lens for reading what’s already happening; Type B (renovation) is directly relevant to 2026–2028 investment decisions; Type C (MICE) has a longer horizon, and — as area-integrated councils mature — becomes a medium-term (3–5 year) theme.
Investment-thesis comparison — Existing acquisition vs. renovation vs. new build
| Item | A. New build in peripheral area | B. Renovation / rebrand in core Recommended | C. MICE new build |
|---|---|---|---|
| Illustrative area | Fushimi Ward / Fujisawa City / Takayama City | Higashiyama Ward / Hakone Town / Kurashiki City | Okayama Ekimae / Yokohama Naka Ward / Shirakawa Village |
| Room count | 60–120 rooms | 40–100 rooms (existing renovation) | 200–400 rooms |
| Expected ADR | ¥30,000–40,000 | ¥50,000–80,000 | ¥25,000–35,000 |
| Construction / renovation unit cost | ¥2.0–2.4M / tsubo | renovation ¥0.8–1.5M / tsubo | ¥2.3–2.6M / tsubo |
| GOP assumption | 30–35% | 35–40% (from existing base) | 28–33% |
| Subsidy use | Indirect (benefits from dispersion) | Indirect (via council) | Area-integrated MICE platform |
| Decision horizon | 2026–2027 (short-term) | 2026–2028 (medium-term) | 2028–2030 (long-term) |
Construction unit cost averaged ¥1.95M/tsubo across structures in 2024 actuals (MLIT Construction Statistics; RC ¥1.736M, S-frame ¥1.647M), roughly +41% versus 2022’s ¥1.38M in two years. On GOP: Invincible Investment Corporation reports 38.9% GOP for the FY2024 (Dec) results at the 91 MHM-operated properties. A first-year new opening should be modeled conservatively around 30% to reflect ramp-up (source: JLL “Japan Hotel Investment Market 2025”; Invincible IR).
Type B (existing renovation) is the best fit with the subsidy because: (1) renovation costs run roughly half of new construction; (2) repositioning is effective in areas with an already elevated ADR base; and (3) existing operating history makes GOP easier to underwrite. In areas with “high rates × thick existing stock” — Higashiyama in Kyoto, Hakone, Kurashiki — the renovation-yield case is easier to build.
Sensitivity in candidate areas — Impact of a subsidy-rejection case
Comparing prior-award areas (20 pioneer regions plus the secondary-call awardees) with candidate areas that have not yet been awarded, no clear correlation is visible at this stage between award status and YoY ADR gains. The gap between Kamakura City (awarded, +40.8%) and Kurashiki City (not yet awarded, +20.5%) reflects idiosyncratic area-level demand structure rather than subsidy presence.
In other words, “is this an inbound-concentration area?” and “is existing supply tight?” are the main explanatory variables for ADR dynamics, more so than the direct effect of the subsidy itself. For investors, the sound framing is not to condition investment on award status, but to treat subsidy as an upside option: if it arrives, area-integrated development accelerates and existing-hotel occupancy stabilizes.
Conversely, if a new area is awarded in the secondary call, it will take 1–2 years for council formation → planning → project execution. Investment schedules should be built around this — timing openings to align with post-award completion (2027–2028).
Site assessment — Kyoto’s Higashiyama Ward reference case
We use Higashiyama Ward in Kyoto as the reference. It is both the densest tourism cluster in the country and a target where subsidy-funded congestion-visualization and secondary-transport are being deployed.
| Target | Higashiyama Ward, Kyoto |
| Anchor sites | Kiyomizu-dera, Yasaka Shrine, Gion |
| Hotel count | N=112 properties |
| May 2026 ADR | ¥78,200 |
| YoY | +21.0% |
| Prior-year month ADR | ¥64,700 |
| Likely council lead | Kyoto City / DMO KYOTO |
| Project track | Area-integrated |
| Ceiling | ¥200M (subsidy rate 2/3) |
| Existing measures | Hands-free tourism, express bus |
| Expected add-ons | Congestion-prediction AI, reservation-based access |
| Spillover type | Type B (renovation) |
Kyoto City has already deployed several city-specific measures: “hands-free tourism” (luggage delivery and storage), the tourism express bus (introduced June 2024), and differentiated municipal bus fares for residents versus non-residents (planned for FY2027). If the subsidy secondary call adds Kyoto, more advanced technical measures — congestion-prediction AI, reservation-based access — will complement these. On the back of this reception-environment upgrade, existing hotels in Higashiyama have room to maintain and lift the current ¥78,200 ADR level over the medium term.
Similar reference cases apply to Kamakura City (¥49,200, +40.8%), Kurashiki City (¥49,100, +20.5%), and Hakone Town (¥53,300, +12.6%). All satisfy the three conditions of inbound concentration × constrained existing supply × subsidy-funded area development, and each holds appeal for Type B (renovation / rebranding) investment.
Investment-decision summary — Aligning award schedules with investment timing
Short term (through Dec 2026)
While awaiting the secondary-call award announcement (expected in the fall of 2026), screen renovation/rebrand deals targeting mid-sized existing hotels in already high-ADR areas (Higashiyama, Kamakura, Kurashiki, Hakone). Lock renovation costs early against continued unit-cost inflation.
Medium term (2027–2028)
Timed with subsidy-project execution. Type A (new build in peripheral areas) should align opening plans with this window. Land acquisition in areas adjacent to awardees (southern Kyoto Prefecture, Fujisawa City, Takayama City, Fukuyama City) should progress from H2 2026.
Long term (2028–2030)
The period when area-integrated councils institutionalize and the MICE platform matures. Type C (MICE) 200+-room developments should be timed to open here. Large pipelines are already underway in Okayama Ekimae, Naka Ward Yokohama, and around Shirakawa Village.
The subsidy is not a direct construction / acquisition subsidy to hotels. Yet area-integrated development can rewrite the very preconditions of investment by shifting the area-wide demand structure. A ¥10B budget and 8.3x YoY growth is a signal at a historically large scale. Around the July 17 deadline and the subsequent award announcement, building the muscle to continuously monitor candidate municipalities and adjacent new-supply news will translate directly into more accurate hotel-investment decisions.
Risk factors and sensitivity
| Risk factor | Impact | Mitigation |
|---|---|---|
| Non-award in the secondary call | Medium | Do not condition investment on award; underwrite on area-level demand structure |
| Continued construction-cost inflation (assumed +5%/yr) | High | Weight the pipeline toward renovation; lock new-build contracts within 2026 |
| Sudden inbound-demand drop | High | Blend in areas with a high domestic-demand share (Hakone, Kurashiki, Shirakawa-go) |
| Over-supply in areas adjacent to awardees | Medium | Continuously monitor filed-application pipelines |
| Cap-rate widening in a rising-rate regime | Medium | Use long-term fixed-rate debt; embed IRR sensitivity in underwriting |
As a sensitivity, on a representative Type B (renovation) case, ADR -10% and OCC -5pt yields a 1.5–2.5pt drop in expected yield. In the base case where subsidy-funded area development materializes and ADR holds with OCC +3pt, expected yield improves by 0.8–1.5pt. The downside and upside ranges are asymmetric, and this argues for anchoring the portfolio in “downside-resistant” formats such as renovation deals.
Bottom line — Treat the ¥10B subsidy as an “upside option”
The JTA’s FY2026 ¥10B overtourism-countermeasure budget is not a direct construction / acquisition subsidy to hotels. Yet area-integrated development — congestion visualization, secondary transport, flow separation — creates three indirect upsides: (1) a shift in demand from cores to peripheries, (2) renovation / rebrand opportunities for existing mid-sized hotels, and (3) stronger MICE-attraction platforms through municipal councils. The data from prior-award areas — Kyoto Prefecture ADR ¥47,300 / +24.7% YoY, Kamakura +40.8%, Kurashiki +20.5%, Shirakawa Village +16.7% — reflect the structure of “inbound concentration × constrained supply” more than the subsidy itself.
For investors, the practical implication is to treat award status not as a precondition but as an upside option. A time-sliced portfolio — renovation / rebrand in the short term (through 2026), new build in peripheral areas over the medium term (2027–2028), MICE-scale development over the long term (2028–2030) — aligns with the subsidy’s execution schedule. The July 17 secondary-call deadline and the subsequent award announcement are important signaling events, and continuous monitoring is warranted for hotel-investment decision-making.
⚠ Caveat on forward-dated ADRs: ADRs in this article are the mean of OTA-listed rates at the survey date and will move as check-in approaches. Rates that appear high today may fall in last-minute discounting. New-supply pipelines (filed-application basis) are expected to grow as further filings arrive — treat them as a floor, not a final figure.
References and Sources
■ Data sources
MetroEngines Research & Consulting aggregates (prefecture/municipality-level ADR and YoY; N = property counts in-text), the JTA list of awarded projects, area plans published by each municipality, JNTO inbound-visitor statistics, e-Stat construction-start statistics, and JLL, and Invincible Investment Corporation (8963) monthly operating disclosures.
■ Model assumptions
Expected yield / IRR references a mid-sized business/tourism hotel at an acquisition price of ¥300M–¥1B. The Type A / B / C framework separates ADR, OCC, and subsidy impacts. Base case = subsidy award; sensitivity = no award, ADR ±5%, OCC ±3pt. GOP anchors near the upper bound of Invincible (8963) FY2024 (Dec) 91 MHM-operated properties actual 38.9%.
■ Limitations and caveats
ADR and occupancy in this article are estimates based on OTA-listed prices and inventory, and may diverge from actual transacted rates and occupancy. Subsidy secondary-round award results are expected in or after August 2026; investment-decision framing here relies on “candidate area = a region with conditions similar to prior awardees.” Opening-date delays and construction-cost inflation for the new-supply pipeline require separate underwriting.
■ Market data
- MetroEngines Research & Consulting — OTA-listed price data (prefecture/municipality-level ADR and YoY; N = property counts in-text), new-opening hotel information, planned supply pipeline
■ Government statistics and public data
- Japan Tourism Agency — Launch of the FY2026 Secondary Call: “Comprehensive Tourism-Area Reception-Environment Development Program for Overtourism Prevention and Mitigation” (2026)
- Japan Tourism Agency — FY2026 Overtourism Reception-Environment Development Program (special website)
- Japan Tourism Agency — FY2024 Supplementary Budget “Sustainable Tourism through Overtourism Prevention and Mitigation” — List of Awarded Projects
- Japan Tourism Agency — Press release on the First-Call Award Decisions for the Overtourism Countermeasure Program (April 18, 2025)
- Japan Tourism Agency — “Support Program for Overtourism Prevention and Mitigation”
- MLIT “Building Dynamics Statistical Survey”
- e-Stat “Construction-Start Statistics” (statistics ID: 0003114490)
- JNTO — “Inbound Visitor Statistics”
■ REIT and industry reports
- Invincible Investment Corporation (8963) — Monthly operating disclosures; 38.9% GOP for FY2024 (Dec) across 91 MHM-operated properties
- JLL — “Japan Hotel Investment Market 2025” — relationship between construction-cost inflation and new-supply ratios
■ News and municipal disclosures
- Shiomi Administrative Office — “Introduction to FY2026 Tourism Subsidies”
- Subsidy Portal — “What is the up-to-¥200M overtourism-countermeasure subsidy?”
- Kyoto City — “Autumn tourism-issue measures (easing concentration at Kyoto Station; promoting hands-free tourism)”
- Japan Tourism Agency — Kamakura City / Fujisawa City Area Plan (Overtourism Countermeasure Model Project)
- Travel Voice — “JTA FY2026 budget decided at ¥138.3B, 2.4x YoY” (December 27, 2025)
- Yamato Gokoro — “JTA FY2026 budget: ¥138.3B, 2.4x YoY — a record high”
